KitLog pro

Powered By Kitlog Pro v2.0

THOMAS'S WEB SITE
' style=
Date:  1-10-2017
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Different Items prior Canopy bonding

Installed the canopy tracks and sanded the supports flush. Bolted the two canopy bows into position with minor adjustments.

Had to adjust 3-4 fueltank bolt holes slightly to align them perfectly with the threaded bushings.

Tomorrow, I will glue the lower CR sealing sitting on the fuel tank and the upper NBR front sealing attached to the front bow in place. This would be difficult after having bonded the PMMA canopy to the frame. NBR is not as resistant to UV rays as CR (Neoprene), so even if the NBR isn't really exposed to those rays (covered), I better make it easy removable in case I need to change it.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.